Product image is representative; revision or series may vary. Contact us to request a specific version.
The Yaskawa GPD-403-Maintenance is designed for the upkeep of AC drives within the GPD series. Operating with an input voltage range of 200–240 VAC 3-phase, this maintenance guide emphasizes regular care to ensure optimal performance.
We sell industrial automation parts backed by our free 2-Year DO Supply Warranty.
Same-day domestic and fast international shipping with UPS, FedEx, DHL, and more.
AMEX, Visa, MasterCard, Discover, wire transfer, net terms, and more.
Repairs and exchanges are available for all automation products.
Drop shipping, blind shipping, and account shipping with no extra fees.
| Manufacturer | Yaskawa |
|---|---|
| Product Type | AC Drive Maintenance |
| Product Line | GPD |
| Part Number | GPD-403-Maintenance |
| Input Voltage | 200–240 VAC 3-phase |
| Input Current | Up to approx. 20 A (model-dependent) |
| Maintenance Interval | Every 6–12 months |
| Cleaning Task | Blow dust/debris from ventilation ports |
| Connection Check | Tighten power & control terminals |
| Cooling Inspection | Check fan & heatsink cooling fins |
| Capacitor Discharge Time | Wait 10 min after power off before service |
| Cover Removal | Wait until DC bus charge indicator extinguishes |
| Safe Shutdown | Remove AC mains before opening cover |
| Insulation Test Method | Measure with megger on power side only |
| Control Circuit Test | Avoid megger on control terminals |
| Wiring Inspection | Check for discoloration/overheating |
| Environment | Keep dry, clean, cool (0‑40 °C) |
For efficient operation, the Yaskawa GPD-403-Maintenance requires periodic maintenance of AC drives. This device operates at an input voltage of 200 to 240 VAC three-phase, with current draws reaching up to approximately 20 A, depending on the specific model. Maintenance is suggested every 6 to 12 months to maintain optimal performance.
Key maintenance tasks include cleaning ventilation ports by blowing out any dust or debris, inspecting fan and heatsink cooling fins, and verifying the tightness of power and control terminal connections. Before performing any service tasks, it is crucial to wait 10 minutes after turning off the power to allow the capacitors to discharge. Additionally, ensure that the DC bus charge indicator is off before removing the cover.
Prior to opening the cover for maintenance, disconnect the AC mains to ensure a safe shutdown. For insulation tests, use a megger on the power side only, avoiding its application on control terminals to prevent damage. Regularly inspect the wiring for any signs of discoloration or overheating, which may indicate potential issues. Keep the environment for this equipment clean, dry, and at a cool temperature range of 0 to 40 °C to promote longevity and reliability.